On July 4, 2010, the 3-person team led by SCG project operation director, Mr. Surapon visited Sinoma EC. Sinoma EC’s Chairman of Board of Directors, Mr. Zhang Qi, General Manager, Mr. He Xinping, Vice President, Mr. Ge Liwu, Chief Engineer, Mr. Dong Lanqi respectively met with them.

 

">

91免费国产在线观看不卡_国产日韩欧美精品片_在线网站亚洲观看_亚洲日韩精品无码偷拍_大荫蒂毛茸茸视频国产_日韩欧美中文字幕有码_中文字幕黄色网址以豐富的內容_国产专区AⅤ在线观看_在线黄色视频免费观看_第一页动漫精品动漫

Position: 首頁 < Home < News < Company News

Technical Communications between Sinoma EC and SCG

PublishDate:2010-07-13 Source:

On July 4, 2010, the 3-person team led by SCG project operation director, Mr. Surapon visited Sinoma EC. Sinoma EC’s Chairman of Board of Directors, Mr. Zhang Qi, General Manager, Mr. He Xinping, Vice President, Mr. Ge Liwu, Chief Engineer, Mr. Dong Lanqi respectively met with them.

In the two-day meeting, technical details were talked, including WHR power plant operation, maintenance, spare parts supply and plant overhauling. Leaders and employees from marketing, project execution, technical and R&D, procurement, after sale divisions attended these discussions.

Sinoma EC built 6 WHR power plant for 3 cement plants of SCG, with total installed capacity of 58MW. The WHR plants for SCG TS plant first phase (9MW), second phase WHR (22MW), TL plant (18MW), LP plant(9 MW) were built by Sinoma EC, and all of them are now in good operation.